Biogas and Anaerobic Digestion Tank Clearance
Cadman Cranes provides specialist grab and lifting support for biogas and anaerobic digestion tank clearance across the UK.
We help plant operators and maintenance contractors assess the removal of digestate and accumulated material, planning the work around the tank, access arrangements and maintenance programme.
Non-entry grab methods may be suitable where the task can be completed from outside the tank. Suitability is assessed for each project, including the tank configuration, material, operating condition and site-specific controls.
Clearance support for biogas plant operators and maintenance teams
Tank clearance needs to fit the way your plant operates. A maintenance manager may be preparing an outage, an engineering team may need access for inspection, or a tank service contractor may need specialist lifting and material-handling support within a wider cleaning package.
Tell us what the work needs to achieve and what happens before and after clearance. That helps define the material to be removed, how it will be received and the interfaces with other contractors. For multi-site operators, a consistent initial brief can also make it easier to compare requirements across different plants.
We work with plant owners, operators, maintenance providers and specialist service partners to establish a practical scope before selecting the equipment.
What is non-entry tank clearance?
Non-entry tank clearance is the removal of material using a method controlled from outside the tank, so personnel do not enter for that task. A crane-mounted hydraulic grab is one possible method where the opening, reach, internal layout and material make it suitable.
It is a description of how a particular task is carried out, not a guarantee that all maintenance can be completed without entry. Nor does it mean that a tank can automatically remain live. Separate activities such as inspection, final cleaning or repairs may need different arrangements.
The assessment should consider the whole work package, including preparation, clearance, material receiving and any subsequent work. HSE guidance on confined spaces explains the importance of avoiding entry where possible and assessing the risks of the particular work.
Applications to discuss with our team
Digestate removal from suitable tanks
Where the tank layout and material are suitable, specialist grab operations can support bulk digestate removal. Send details of the material’s consistency, estimated quantity and any known changes within the tank, together with the intended receiving arrangements.
The clearance brief should distinguish between removing bulk material and the final condition needed for inspection, repair or return to use. This allows each element of the wider job to be assigned to the appropriate team.
Accumulated solids and sludge removal
If deposits are the reason for planned clearance, explain where they are located and what is known about their composition. Material behaviour, access and obstructions influence whether a grab method is appropriate. We will assess the requirement rather than assume that one attachment can address every deposit.
Maintenance preparation and associated lifting
Tank maintenance may involve lifting equipment or components as well as removing material. Include any proposed access work or equipment movements in your brief so the lifting requirements can be considered together.
Our wider process-plant experience includes lifting reactor vessels, access structures and treatment equipment. Any additional lifting work is defined within the agreed scope rather than assumed to be part of clearance.
Specialist grab equipment selected for the task
Our tank clearance and grab service includes remotely controlled hydraulic attachments used with suitable cranes. The lifting arrangement is selected for the tank access, material and operating radius.
A larger grab is not automatically the best option. Openings, internal equipment, material weight and the receiving process can limit how the work is carried out. A realistic programme depends on these details, not simply the stated capacity of an attachment.
For UK projects, mobilisation can be planned using the appropriate crane and specialist equipment arrangement. Provide the site postcode and intended maintenance window when you contact us.
Biogas and process-plant experience
Digestate clearance at an agricultural plant in Stafford
Cadman supported Construction Crew on a contract lifting project at an agricultural plant in Stafford, clearing digestate from an anaerobic digestion tank. This particular project used our XL 4m³ hydraulic grab, clearing approximately 500 tonnes of material over a week.
Process equipment and biogas-treatment lifting at Palm Paper
At Palm Paper’s King’s Lynn mill, our work supported a new wastewater recycling plant. Alongside reactor-tank installation for Oostwouder NL, follow-on lifting for Econvert included access structures, process equipment and an associated desulphurisation plant preparing biogas for use as fuel.
How to plan your tank clearance enquiry
Information that helps us assess your requirement
- Site location and the company commissioning the work.
- Tank purpose, dimensions, construction and available drawings.
- Opening dimensions and details of covers, roofs or membranes.
- Known internal equipment, pipework and obstructions.
- Material description, approximate quantity and available photographs.
- Current operating condition and planned preparation arrangements.
- Access routes, possible crane positions and available ground information.
- The receiving point for removed material and responsible handling contractor.
- Target dates, working restrictions and other planned maintenance activities.
You do not need a complete technical pack to start a conversation. Send the information available and identify any gaps so we can discuss the next steps.
Quality and contractor coordination
Our published accreditations include ISO 9001, ISO 14001 and ISO 45001. These support the assessment of our quality, environmental and health and safety management systems.
For a managed lifting package, discuss our CPA Contract Lift service. Share your plant’s contractor requirements and the roles of existing maintenance partners at the outset, so the proposed lifting scope can be coordinated with their work.
Biogas tank clearance frequently asked questions
-
It may be possible to carry out the material-removal task from outside using a suitable grab arrangement. The opening, material, tank layout and site hazards must all be assessed. Other maintenance tasks may still need separate arrangements, so non-entry clearance cannot be promised for every tank or complete project.
-
That cannot be assumed. Operating status, gas conditions, access and plant-specific controls must be considered before work is planned. A successful live-tank project in another sector does not establish that the same method is suitable for an operating digester.
-
The available opening and cover arrangement are key to suitability. Send drawings and photographs, including opening dimensions. Any preparation or removal of covers must be addressed within the wider maintenance plan; we cannot confirm access from tank capacity alone.
-
No. Grab clearance addresses bulk material removal within an agreed scope. Final washing, inspection, repairs, transport and disposal may involve other specialists. Explain the end condition you need so the responsibilities can be established before a quotation is agreed.
-
Yes. We can discuss a specialist lifting and grab package alongside your existing maintenance or tank service provider. Sharing the programme and identifying the receiving arrangements for material helps define how the teams will work together.
-
Both depend on the assessed scope. Material characteristics and volume, tank access, working radius, resources, receiving arrangements and the required finish all influence the proposal. We use the project information to establish a suitable approach rather than quote a universal daily output.
-
We can discuss UK requirements across multiple sites. Each tank needs its own assessment, even where plants share an owner or similar equipment. A site schedule with locations, maintenance windows and tank details is a useful starting point.
Discuss planned clearance at your biogas plant
Share your tank details and maintenance dates with Cadman. We will discuss the information needed to assess specialist grab clearance and the lifting support that could fit your wider programme.