Lifting Services for Wind and Electricity Infrastructure
Cadman Cranes provides lifting support for wind energy projects and electricity infrastructure, including cable handling and electrical equipment installation. We work with developers, network delivery partners and specialist contractors to plan lifting around site access, equipment deliveries and construction or maintenance programmes.
From cable drums at a port to transformers at a developing energy site, our role is to help you move and position the equipment your project depends on. Engage us early to assess the lifting requirements and identify the information needed for a workable plan.
Lifting planned around your project programme
Energy projects bring together equipment suppliers, transport providers, civil contractors and electrical installation teams. A late delivery, unsuitable crane position or incomplete equipment information can affect several work packages at once.
Our lifting team works with you to understand what needs to move, where it needs to go and how the operation fits the wider programme. This is particularly valuable when equipment arrives in phases, the site is still being developed or several contractors need access to the same area.
We support project, construction, procurement and maintenance teams looking for a lifting partner with relevant delivery experience and a clearly defined scope.
Wind and electricity lifting applications
Cable drum and cable reel handling
Cable installation programmes can require heavy drums to be transferred between storage, transport and work locations. Planning needs to account for the drum’s confirmed weight, approved handling arrangement, access to the load and the capacity required at the actual working radius.
We have supported NKT’s East Anglia Three cable works and the replacement of cable-reel supports at Galloper’s operations and maintenance facility. These projects provide practical experience of handling valuable cable assets and coordinating associated work.
Substation and transformer lifting
Transformer and substation equipment lifts need reliable load information and a clear understanding of the delivery and final placement positions. Share the equipment drawings, lifting points, centre-of-gravity information where available, base details and the programme with our team.
We can assess the lifting requirement with your installation contractor, including crane access, rigging space and ground support. Work at operational electrical sites also needs to fit the asset owner’s access controls and agreed safety arrangements. Electrical connection and commissioning should be identified as separate work packages.
Wind project construction and maintenance support
Our wind-sector experience includes onshore cable infrastructure and operations-base work supporting offshore wind farms. We can discuss lifting requirements for cable jointing houses, generators, supporting equipment and associated infrastructure within an agreed package.
Early conversations help establish the scope and suitable equipment. Tell us whether the requirement is at a port, storage compound, onshore cable route or operating facility, together with any restrictions on access and working times.
Electrical equipment offloading and placement
Phased deliveries require lifting resources to be available when equipment and receiving areas are ready. Our work at two Norfolk solar projects included the offloading and positioning of transformers and inverters across separate mobilisations.
For your project, we can assess the loading or offloading sequence, delivery vehicle position and final placement. Share any supplier handling instructions and programme changes so the proposed arrangement can be reviewed.
Supporting procurement and contractor assurance
Cadman’s published credentials include ISO 9001, ISO 14001 and ISO 45001 certification, alongside Achilles UVDB Verified status. Review our quality and safety credentials when preparing your supplier assessment.
Send us your project-specific onboarding and documentation requirements early. We can discuss them alongside the technical brief so the proposed lifting package reflects both the work and your procurement process.
Proven experience across energy infrastructure
East Anglia Three cable works for NKT
NKT A/S engaged Cadman to support onshore cable infrastructure associated with ScottishPower Renewables’ East Anglia Three project. The published scope included handling cable drums weighing up to 72,500 kg at Ipswich Docks and loading them onto specialist transport supplied by HC Wilson.
Our work also covered the lifting and transport of prefabricated cable jointing houses and supporting generators along the Bramford–Bawdsey route. It demonstrates our role in coordinating lifting and equipment movements between delivery locations and work areas.
Galloper cable-reel support replacement for RWE
RWE appointed Cadman as Principal Contractor to replace the support arrangement for six cable reels at Galloper Offshore Wind Farm’s Harwich operations and maintenance facility. The reels weighed up to 90 tonnes, and the existing timber supports had deteriorated.
The scope brought together lifting, ground preparation and a new engineered support system. Work included 60-tonne and 500-tonne crane operations, with delivery completed in less than four weeks. The project shows how lifting can be integrated with a wider infrastructure maintenance package.
Transformer and inverter placement for PACE
At Three Bridges and Attleborough Road solar farms in Norfolk, we completed 18 planned lifts for Pathfinder Clean Energy: 12 inverters and six transformers. The largest units weighed 22.5 tonnes.
The work took place over approximately two months. Site surveys identified access and rigging requirements, and PACE prepared the relevant working areas before mobilisation. The lifting resources were coordinated around equipment arriving on different dates.
Early planning that helps your installation team
Battery energy storage systems have their own installation requirements. If your scope includes battery containers, skids or related storage equipment, visit our dedicated BESS crane hire and contract lifting page. For mixed energy projects, tell us which assets need lifting so the work packages can be clearly defined.
Wind and electricity lifting frequently asked questions
-
Yes. Early contact allows us to discuss the scope, available equipment information and site constraints. A useful initial brief includes the location, load schedule, intended dates and drawings. The proposed method and quotation can then be developed as the information becomes sufficiently detailed.
-
Yes. Our East Anglia Three work for NKT included handling drums weighing up to 72.5 tonnes. This is a project example, not a universal lifting limit. A new lift must be assessed against the load, handling arrangement, crane position and working radius.
-
We can assess lifting and placement requirements for substation and electrical equipment. Supply the load details, site layout and any asset-owner restrictions. The lifting scope should be coordinated with the electrical contractor’s work and the site’s access arrangements.
-
Our published examples include onshore cable works and port-based operations and maintenance infrastructure serving offshore wind farms. Tell us the exact location and lift involved. These examples should not be taken to mean that every offshore installation or turbine erection requirement is within the same service scope.
-
Yes. Our Norfolk work involved separate deliveries and return visits across two sites. We can discuss a phased lifting programme, subject to the confirmed scope, equipment availability and readiness of each working area.
-
Send the site postcode, equipment weights and dimensions, lifting-point details, drawings, delivery and placement positions, available ground information and target dates. Include access restrictions and whether you require crane hire or a managed contract lift. Tell us where information is still provisional.
-
We support energy projects across the UK. Mobilisation and resources are agreed around the location and lifting requirement, so contact us with your project details to discuss the proposed delivery arrangement.
Plan your next energy infrastructure lift with Cadman
If you are preparing a cable-handling package, scheduling transformer deliveries or planning maintenance at an energy site, send us your brief. We can discuss the lifting scope and the next steps towards a site-specific proposal.
Arrange a site survey or call 01206 986610.